Construction Photos 02-08-13

  • Week 02-08-13 Week 02-08-13 Cavanaugh installing drywall in the waiting room on the north end.
  • Week 02-08-13 Week 02-08-13 CFI installing GlasRoc sheathing on the east stair tower.
  • Week 02-08-13 Week 02-08-13 J.W. Didado pulling electrical wires through the brick veneer for the exterior lights for the ground level retail spaces.
  • Week 02-08-13 Week 02-08-13 NE Picture.
  • Week 02-08-13 Week 02-08-13 SW Picture.