Construction Photos 04-05-13

  • Week 04-05-13 Week 04-05-13 SW Picture.
  • Week 04-05-13 Week 04-05-13 NE Picture.
  • Week 04-05-13 Week 04-05-13 Karvo grading the subgrade on the west end of Erie Street.
  • Week 04-05-13 Week 04-05-13 Henthorn priming the first level of the west stair tower.
  • Week 04-05-13 Week 04-05-13 Cavanaugh installing directory signage on the fourth level.